The suite of documents below outlines procedures and protocols for accessing the rail corridor to install or maintain utility services. Third party contractors working in the rail corridor must complete the Rail Corridor Induction. CTA Link.
Applications fees are $350.00 plus GST for non-intrusive activities, such as: locating in-ground services; aerial, native vegetation and topographical surveys; site inspections; and collecting water samples from monitoring wells.
Applications for intrusive activities includes geotechnical investigation and installing water monitoring wells; installing, maintaining, disconnecting, relocating and removing pipelines, services and structures; grouting the voids of redundant pipelines and services. The application fees for intrusive activities are either $800.00 plus GST for $3,000.00 plus GST for depending on the extent and scale of the scope.
All applications are subject to a formal review by Arc Infrastructure. This review ensures the technical requirements and safety protocols comply with current engineering and safety standards. All applications forms must be completed in full, with detailed work activity description and be accompanied by all supporting documents. Incomplete applications will not be accepted and will delay the review process. The review process can take up to 12 weeks.